Skip to the content
Past Projects
- Eskom’s Filter system for Kriel Power Station Ash Handling System – Investigate and solve the causes of filter box over-pressurization resulting in joint separation and ash escape during operation.
- Industrial Feasibility Study for the construction of 12000 tonnes per year finding media (steel balls) foundry in Ngezi, Zimbabwe, for Bali Technology Foundry (Pvt) Ltd. Feasibility report reviewed by Hatch (Pty) Ltd as the experts for the then prospective funder, PIC.
- Design and specification of dust-suppression system for Shawa mine, Zimbabwe.
- Design and specification of underground compressed air system for Samancor mine.
- Structural steel fabrication and installation of Ekurhuleni Germiston Depot.
- Silex transfer chute design, fabrication and installation of Saint Cobain mine.
- Design & Specification of Silo and Conveyor System for Namekara Mining Company Limited, Uganda.
- Fabrication of transformer skids for Schneider Electric.
- Engineering design for the modification of Paarl Waste Water Treatment Plant for Lephalale Municipality.
- Fabrication of steel structures and installation for Ekurhuleni Municipality at Germiston.
- Design and industrial equipment foundations for Old Mutual Property Development and Management.